EN PT

EXECUTION PROJECT - Single family habitation sample



  • Pág.
  • Electric Nets

    Plants of all floors are drawn, with indication of the type and the location of all points of illumination, switches, switchboards, outlets, fixed devices (air conditioner, hidro bathtubs) etc.



  • Low Networks

    Plants of all floors are drawn, with indication of the location of all TV plugs, RDIS, Telephone and similar sound devices (bus driver, computer network).



  • Security Against Intrusion Network

    Plants of all floors are drawn, with indication of the location of all volumetric detectors and similar devices (central command, sound alarm).



  • General Construction

    Plants, elevations and views are drawn to the scales of 1:50 or 1:20, crossing the information of the stability project with arquitecture, indicating the constitution of all the elements (mapping of the location of the brick masonry, concrete, brick work, air box, other coverings, window boxes, ventilation, smokes and sewers) and enumeration of the exterior and interior vains for mapping.



  • Fake Ceilling

    Plants of all floors are drawn, with indication of the fake ceilling to execute, locating in these the light points, defining the type of illumination and material to use .



  • Floors

    Plants of all floors are drawn, with indication of the distribution and stereotomy of the floor and, in case of existing map of finishings, describes the materials chosen for application.



  • Map of Vain

    The interior and exterior vains are drawn, indicating the dimensions, the number of parts, the type of material, type of opening, hardware, type of boxes and the type of glass.



  • Map of Finishings

    The finishings for all the construction are defined, for the walls, ceillings, floors, floorboards, steps, doors and sanitary garrisons, wares, taps, etc. Its ideal in case the owner of the construction intents that the choice of materials is done by the skill of the project executant (to choose mosaics, tiles, wood and sanitary).



  • Kitchen

    The kitchen is drawn in detail, with the closets and group of bencheses to execute, defining the dimensions, the materials, the forms and the finishings.



  • 3D Kitchen

    For visualization of the kitchen by owner of the construction, before executing it. Realistic perspectives will be created.



  • Sanitary Installations

    The sanitary installation plants are all drawn, defining the stereotomy of the floor, walls and ceiling. There are constructive details for the execution of the doorway, the mirror, the group of benches, etc.



  • Squared Stone

    The stones are drawn in all detail, associated to vains (ex: lintels, door-post, sills and doorsways) and to its front elevation, with indication of the type of material and dimensions for the rock cutting.



  • Stairs and Keep

    The stairs are drawn in detail, indicating the dimensions and materials of the coverings and mirrors of the steps, as well as the form and material of the stairs



  • Exterior Guards

    The exterior guards are all drawn in detail, indicating the dimensions and materials.



  • Main Door

    The main door is drawn in detail as well as secondary doors, that are not in frames, indicating dimensions, the type, materials, stereotomy, colors, etc. The groundsill is also drawn.



  • Doors and Garrisons

    The doors and garrisons are drawn to the detail, indicating dimensions, the type, materials, stereotomy, colors, finishings, etc. More specifically, the views, lintels and groundsill are drawn.



  • Gates

    Access gates are drawn to the detail, as well as of the peripheral railing.



  • Closets

    The closets are all drawn, detailing the plant, elevation and views, indicating the materials, stereotomy, finishing and the exact dimensions.



  • Fixed Furniture

    It is drawn fixed furniture detail (or not), indicating the materials, finishing and dimensions.



  • Others

    Other significant aspects are drawn in detail.